Involved with RM65,000,000 project and in charge for Abutment B, Pier 7 and Pier 6.
Managed to build a pilecap, column, hammerhead and crossbeam and do remedial works.
Managed to build PERI shoring system until soffit level for Pier 7 and Pier 6.
Engaged with Professional Engineer (PEPC) to solve problems on site.
Getting to know about the stressing method and form traveller installation.
Pictures below show all my duties as Engineer C&S
Since, our site required specific standard. Therefore, I need to engage directly with PEPC to fulfill design requiments needed.
Backfilling
Blister & Tendon Profile
Build Embankment
Concrete Works at P7
Covering Slope
Crosshead P7
Curve Rebars
Form Traveler
Getting to know PT Beam
Hammerhead 1st cast
Hammerhead 2nd cast
Hammerhead 3rd cast
Hammerhead Finishing Process
KTMB 038
Load Bearing Test
Monitor Cement Plant
PERI Formworks
PERI Shoring System P6
PERI Shoring System P7
Piers P6
Pilecap P6
Remedial Works
Removing Sheet Piles
Research with Forensic Engineering UTM
RTC Inspection with Safety Officer
Scanning & Coring Process
Solve Authority Complaint
Stagging for Pier P6
Stressing Work
Transportation
Trial Mix for Grout